An office renovation is all the time a complicated process that requires cautious planning. Deciding how much money you’re keen to spend because of renovation is step one you have to do. The funding contains the cost of supplies and finishes, lightening, fixtures and fittings, and naturally the price of labour – portray, tilling and plumbing.
In changing the outdated wash basin and below sink cupboard with this new vanity sink unit rather than having the water and waste pipes going via the inside of the cupboard (wasting worthwhile storage space) I had in thoughts to bring the new sink out from the wall a couple of inches and re-route all the pipework to go beneath and behind the brand new cabinet.
Now that we had been doing a full renovation of the Livingroom, after checking to verify that the wall was not structural we determined that as a way to give easier entry to the house under the stairs and to open it up to make the Livingroom more spacious we might knock down part of the brick wall to widen and raise the height of the opening.
This text is in regards to the full makeover of our shower room, giving an overview of the steps we took, with hyperlinks to detailed step-by-step guides for 2 associated mini projects; repurposing the previous towel rail for a bathroom roll holder, and making the lavatory cupboard with mirrored doorways.
Having taken provision for heating and water I turned the heating and water off, drained the radiators and flushed the cistern, after which I eliminated the previous radiator and cistern from the wall; after which spent the rest of that day (working late into the night time) to tile the 2 related walls.